TUNNEL
artfest iceland
Isafjordur, Iceland 2005 – cooperation with Elin Hansdottir and Darri Lorenzen.
A 160m long Tunnel with 31 shifts in direction, 3 stairs und 2 bridges.
6 tons of wood, 12.000 screws, 160 lightning bulbs and 600 liters of paint.
Design and Productions Neulant van Exel
in cooperation Elin Hansdottir & Darri Lorenzen